Sunday, September 1, 2013

Attic transformation

Now

Two and a half months ago. View of the "small closet" from the master bedroom

View of the door from the back of the closet

One of the (slightly creepy) crawl spaces


View of the messy ceiling

Screwing down the loose floorboards

Removing old insulation and lathing

Adding vent chutes.

Insulating the soffit.  Not fun. 

Insulating one of the crawl spaces

Knee walls put in

Lunch

All the insulation finally done. This stuff was NASTY. 

New electric switch.  Putting up the drywall over the crawl space door

Mudding and taping the drywall



With new light fixtures

Carpet underlayment

Using the stretcher bar to lay the carpet

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.